cable length
英 [ˈkeɪbl leŋθ]
美 [ˈkeɪbl leŋθ]
链(英国608英尺,美国720英尺);电缆长度;线长;电线长度
英英释义
noun
- a nautical unit of depth
双语例句
- What is the maximum cable length between PC and camera ( s)?
再PC与照相机之间的电缆最长是多少? - The influence of skin current waveform on core voltage is studied. The effects of the starting and ending resistance change on core voltage and the change relation of core voltage with cable length are also researched.
研究了皮电流波形对芯电压的影响、电缆始末端电阻变化对芯电压的影响以及芯电压随电缆长度的变化关系。 - Determination of Control Cable Length of PC Cable-stayed Bridge
PC斜拉桥施工控制索长的确定 - Measurement of the Coaxial Cable Length
同轴电缆长度的测量 - Then the calculation formulas of stressed and unstressed cable length are required by the cable element length's integral method.
最后由积分法导出了主缆索有应力和无应力长的计算公式。 - It is found that the efficiency of optimal adjustment method with the variation of cable length as design variables is high. It has based a way for the shape adjustment of whole cable net antenna structure. 3.
通过大量的数值计算,得出了基于索长改变量为设计变量的优化调整方法效率高的结论,为天线整体结构的网面调整奠定了基础。 - Based on the parabola and catenary theories, calculation formulas on the cable length are summarized, and the precision is discussed.
以抛物线和悬链线理论为基础,总结推导了悬索索长的实用计算公式,对各公式的计算精度进行了分析。 - In the oil and gas field development process, the well depth measured by measuring the length of running cable, but the current cable length measurement mainly by motor and Martin Dyke wellhead two measurement methods.
油气田开发过程中的井深测量是通过测电缆运行长度来实现的,而目前对电缆长度计量主要有井口马达和马丁代克两种计量方式。 - As a kind of pre-stressed structures, the most important factor of the deviation of the initial shape and initial pre-tension of cable-strut tensile structures is the member length error ( cable length error and strut length error, hereinafter referred to as "length error").
作为一类预应力结构,构件长度误差(即索长和杆长误差,以下简称为长度误差)是造成索杆张力结构初始形态和初始预张力偏差的最主要因素。 - The calculation for construction control of the bridge is made with 3D Bridge program and the unstressed cable length method is used to control the final target status of the bridge in the spacial program.
施工控制计算采用3DBridge进行,并在空间程序上利用无应力索长法控制斜拉桥最终目标状态。
